When you deal with Insol, you are going to get the best engineering available.

Our wind tunnel has been designed as an open jet, high power, short tunnel configuration, specifically for testing 1:1 scale building façade elements for structural integrity and wind noise. It will not be suitable for Boundary layer testing with scale models of buildings or other uses such as automotive.

Fan delivery

The wind tunnel will be able to generate flow velocities up to 200km/h and fit large 1:1 scale models over its 4m diameter turntable. With full variable speed control over the 4 centrifugal fans, maximum control of wind speeds will allow for low speed acoustic testing as well as high speed structural tests. 

 

 

Insol Wind Testing Tunnel 2

Our new testing facility is located at our office in Invercargill, New Zealand.

  • Commissioning beginning September 2019
  • 1.5 MW total power draw at max capacity
  • Capable of sustaining 500m3/second
  • Max speeds of 200km/h through a 3m x 3m nozzle configuration, or 112.5km/h for 4m x 4m nozzle
  • Full 1:1 scale load testing of complex façade construction details
  • Unique in the Southern hemisphere
INSOL_96copy
INSOL_96copy

Our new testing facility is located at our office in Invercargill, New Zealand.

  • Commissioning beginning September 2019
  • 1.5 MW total power draw at max capacity
  • Capable of sustaining 500m3/second
  • Max speeds of 200km/h through a 3m x 3m nozzle configuration, or 112.5km/h for 4m x 4m nozzle
  • Full 1:1 scale load testing of complex façade construction details
  • Unique in the Southern hemisphere

If you can't find what you want
it's likely we can build it!

The team at Insol provides a vast experience pool to draw from. We have the ability to custom design, engineer and build to your specific requirements.